Q. Why does it cost so much to build a home?
How do GC’s make so much… when they don’t do any of the work?
General contractors are happy to build a house for customers
exactly
like they want. If the house appraises for $200,000, the GC sells it
to them for $200,000. The customer is happy because they get a brand
new home, just like they want, for market value. The general
contractor (GC) is also happy, for three reasons:
·
The GC didn’t have to do any of the labor to build the house. GCs
basically act as a project manager, and hire subcontractors to do all
of the actual construction work. GCs supervise the work, collect
invoices from the subs, and pay the bills. GC will lead the customer
to believe that his profit margin is 10%, when in fact it is 35% to
50%.
·
The GC only pays an average of $118,000 for the materials and the
subcontractors. That’s a $82,000 profit off just this one house.
·
The GC was overseeing the construction of
four
houses at the same time. For a standard six month home construction
cycle, he makes over $300,000!
Being the owner/builder, the $82,000 is
your savings, not to mention the interest saved!!
Q. Can I customize my home the way I want?
A.
Yes, you can. People are different, with different desires and needs.
We can custom design a home to fit your needs and budget.
Q. Will I get quality
materials?
A. Yes, Redstone
Engineered Home Systems, Inc. only supplies premium grade materials.
Q. How long will it take to
build my home?
A. Every customer is
different. Some complete the project in 3 months, others take 6
months. The more complex the home, the more likely it is to take
longer. We do not believe that building a home should be a race for
quick completion, but a scheduled project for a quality home. Accurate
budgeting and scheduling up front will make the building process
easier and quicker. The "Engineered System" portion of your home, can
be up in as little as 4 days. We are here to help you in those areas.
What is meant by being an
Owner/Builder?
A. It means you call the
shots, You decide what work you want to do yourself, what work you
want a subcontractor to do for you, where you want to build, how much
money you want to spend, and what custom features you want to include.
Q. What if I have no building
experience?
A. Our Engineered system
is designed for people just like you. Included in our engineered
system is an easy to follow building manual. Remember we are just a
phone call away.
Q. What if I need Engineered
"Stamped" plans for my permit?
A. We have engineers that
work to develop the proper set of plans for your project so you are
ready for "stamped" plan submission at your local building department.
The Engineered System Home package includes these stamped structural
drawings at no extra cost to you. The only additional cost, would be
for your foundation drawings. These run about $600.00
Q. Do these homes meet
building codes?
A. Absolutely....... Each
home will meet or exceed your local/regional building codes
Q. What is the lead time?
A. This will vary from 4
to 6 weeks, depending on the size of the system and the time of year.
Because we produce one system at a time, our production schedule
for the prime building months are usually filled early. Please contact
us for specific information regarding lead time.
If you should have other
questions.............. Don't hesitated to call......... We are here
to help you build your Dream.
|